SmartGrid loginSmartGrid
ENFRFI
Scroll to build
From cell to grid

One counter party. Cell to 110 kV.

You just watched a 20 MW plant go from one LFP cell to a live grid connection, ready for 4 h. We engineer, deliver and operate every step of it.

See the offer
01 — The offer

Certainty of outcome.

We take you from a permitted site to a revenue-generating battery storage asset in 9 to 12 months. One counter party for hardware, control software, grid qualification and operation, so there is no seam for the integration to fall through.

9–12months

Permitted site to COD

The date is contractual, and we hold it whether the delay would come from supply, civils or qualification.

98%

Availability commitment

Continuously measured by the platform. Any shortfall is credited against your O&M fees.

1counter party

Across every discipline

And the AI trading optimiser of your choice integrated, with no lock-in.

02 — What we take off the table

Four risks removed.

Schedule

Long-lead equipment, weather windows and civil works stack up. A slipped quarter moves the whole return profile.

Contractual COD

Grid qualification

Grid code compliance testing is where projects stall for months. Nordic requirements are the strictest in Europe.

Passed in month 9 · FI

Integration

Cells, PCS, EMS, SCADA, transformer, trading interface. Each seam between vendors is a place accountability disappears.

One counter party

Performance

An asset that is built but unavailable earns nothing. We guarantee uptime with SLA and performance guarantees.

98 % availability
03 — Delivery

The 9-month path.

From site handover to grid code testing in nine months, with the optimiser live and earning by month 12.

M 0–3Engineering and procurement
M 3–7Civils, install, MV works
M 7–9Grid code testing
M 9–12Optimiser and revenue

Jumps back into the 3D at the foundations and plays civils, installation and MV works.

04 — Track record

Grid scale. Verified in Europe.

14

Sites operating

Energised and operating on all markets · 1.6 MW to 43 MW

7

Sites in delivery

Contracted, in delivery · 5 MW to 50 MW

Fingrid SJV 2024Elering certifiedFCR-N · FCR-D · aFRR · mFRR
05 — After COD

Our commitment does not end at handover.

O&M services

O&M with SLA and performance guarantees for up to 10 years. We operate and maintain your site and guarantee availability and performance.

Revenue monitoring

Check revenues daily or weekly, benchmark against peer sites, and compare your optimiser against the others in the fleet.

AI trading choice

If a better AI trading service appears, we integrate it at no cost to you. No lock-in, no re-integration fee.

SmartGrid revenue monitoring screen
SmartGrid · revenue monitoring
06 — The group

Three companies, one engineering standard.

FR

Paneco Energie SAS

The contracting hub
  • Commercial counter party for European projects
  • R&D, grid software and control-system design
  • Engineering, grid studies and protection
FI

Paneco Energy Oy

Project delivery and O&M
  • Delivery, installation and commissioning in Finland
  • Grid code compliance testing with Fingrid
  • Operation and maintenance, crews and spares in country
FR

Paneco Energie Systèmes

Control systems and software
  • PowerGrid EMS and SCADA
  • Plant controller and protection logic
  • SmartGrid platform
We power the grid

Get your grid storage ready for tomorrow.

Talk to us

Tell us about your site.

A few lines on the project or the question. We reply within 1 business day.

Inquiry type *
24/7 control room +33 1 6229 0426